A fire safety and facade remediation programme in an occupied residential development.
The scheme is a contemporary multi-storey residential development of purpose-built apartments arranged across interconnected blocks, featuring contrasting coloured facade cladding systems, recessed balconies, large glazed openings and external access walkways. The building is of reinforced concrete frame construction with a combination of rendered and rainscreen-clad elevations, arranged over multiple floors with communal circulation areas and controlled access for residents.
Because the development remained fully occupied throughout, all improvement and fire safety upgrade works required careful planning and phased delivery to minimise disruption to residents and maintain safe access and egress routes at all times.
Managing the facade investigation stage and the wider fire safety review.
As part of its project management role, Osborn Associates coordinated and oversaw all activities associated with the facade investigation stage, managing specialist consultants, surveyors and subcontractors to deliver the technical information supporting the wider fire safety strategy and remediation objectives.
A key aspect of the role was planning and supervising intrusive investigative works within a fully occupied residential building, with a strong focus on resident safety, health and safety compliance and CDM requirements. The scope included managing subcontractors carrying out opening-up works to cladding and brickwork to facilitate detailed facade inspections, with all intrusive works carefully controlled and reinstated to maintain the integrity and appearance of the building envelope.
Osborn Associates attended site regularly to monitor progress, quality and compliance, and attended client and consultant meetings to report on programme, risk and technical findings. Alongside the facade investigations, the company coordinated associated fire safety review activities - including fire alarm system investigations, cause and effect studies, FRAEW reporting, engineer reviews and contractor procurement - to support the development of a retrospective fire strategy and the eventual facade replacement and recladding works.
Investigating and remediating a live, occupied building without disruption.
The central challenge was carrying out intrusive investigation and fire safety works within a fully occupied residential building while keeping residents safe and their homes accessible. Safe access, egress routes and fire safety provisions had to remain operational at all times, with every opening-up made good on completion.
Coordinating the investigations so their findings fed cleanly into the wider fire strategy and remediation planning was essential to progressing the scheme toward its ultimate objective - the full recladding of the building.